A9 update
Earthworks to form park and cycle route on old A9.
![]() | ![]() |
Earthworks to form verges along southbound diverge sliproad.
![](/files/URzNs3dm7j_L1q.jpeg)
Excavation of drainage ditches from Redgorton access track to tie into filter drainage along A9.
![](/files/QFNXQDuS78s3bQ.jpeg)
Concrete for construction of Variable Message Sign post at southbound tie in on northbound carriageway.
![](/files/Z88zDTsN6igdii.jpeg)
Tay Crossing Update
Piling works continue for west abutment.
![](/files/eBpY4kW-lRa3PX.jpeg)
Works have been continuing on the construction of the traveller system and temporary props which will be used to construct the Tay Crossing concrete deck on the west pier side.
![](/files/8OaKjylhAUw3Wr.jpeg)
Link Road Update
Earthworks underway for construction of footpath around A93 roundabout.
![](/files/Tf3S6RsS5BSH7u.jpeg)
Surfacing non-motorised footpath from Scone toward A94 roundabout.