Project Update - May 8 2023

8th May, 2023
CTLR Updates

A9 update

Completion of applying and rolling cement-bound granular material (a granular material or soil, mixed with cement, which is used as a subbase for the paving).

BT operative pulling cables through ducts.

Construction of access to deck of A9 overbridge for concrete pour of diaphragms.

Installation of drainage under southbound carriageway.

Tay Crossing Update

Preparing for east pier pile cap concrete pour. Laying spacer blocks down on concrete blinding for steel reinforcement cage to be constructed upon.

Completion of pile installation on west pier and pile rig moved over to east side.

Link Road Update

Drainage installation on west bound carriageway, near A93 roundabout.

Laying and rolling of type 1 subbase from Tay crossing heading east, ready for CBGM to be installed.

Pouring of concrete kerbs at Stormontfield roundabout.