What’s happening on site 21-09-2018

This week has seen the southbound merge slip road on to the A9 surfaced.

Work has been ongoing installing the CCTV poles.

 

Kerbing, safety fencing and soiling to the verge at the old A9 northbound merge slip road.

Sub-base has been installed on ruthvenfield link road.

Footpath works to new foot bridge approached are ongoing.Β  Handrail installation and painting and welding to the footbridge have also been carried out.

Pattern concrete has been installed to revertment under structure 1 over the A9.

Landscaping works are ongoing throughout the site.