The second lift of the S05 A9 lade culvert reinforcement cage took place yesterday. This forms the culvert walls and roof on the west side of the A9 and marries in to the base section that was lifted last weekend. A 500t crane was used to lift the cage into place. A timelapse video of the lift can be viewed at https://youtu.be/YvykZ22pMmA

Works on S04 culvert under the new link road is ongoing, with the base reinforcement works complete ready for the next concrete base pour next week.

Earthworks to form the West Connector road that will link the existing A85 Crieff Road to the new link road is now well underway as well as the main line to the west of the A9 and the area to the north of the Crieff Road.

Works to replace the culverted section of Newton Burn to the south of McDiarmid Park were completed this week.