What’s happening on site 14-07-2017

Works progressing well with the new Crematorium wall. Stonemasons have commenced cladding the wall with Perthshire sandstone.

Works to install the Crematorium overflow parking are also progressing with the first section of reinforced grass paving installed.

Surfacing works have taken place to form part of the new slip road off the A9, southbound that will eventually connect to structure S01 – A9 overbridge.

 

Final preparations are taking place to Structure S01 bridge abutments in preparation for the beam lifts next week.

Installation of reinforcement and formwork for the bridge abutments has been taking place on Structure S02, bridge over the River Almond.