What’s happening on site 06-10-2017

The steel reinforcement that forms the east wing wall to structure S01 bridge over the A9 has been installed this week.

Steel reinforcement installation is also ongoing to form the deck of Structure S02 bridge over the River Almond.

Kerbing works have been progressing on the section of road around the new Crematorium entrance with public utilities works also ongoing in this area.

Work is continuing on the A85 west junction, changing the existing roundabout in to a signal controlled junction whilst constructing an additional lane.

Road surfacing has been laid to the tie in of the new northbound slip road on to the A9.

Work has commenced installing slope drainage to the earthworks cutting in the Bertha Park area.