What’s happening on site 06-07-2018

Following the opening of the new southbound slip road off the A9 last week, work is now underway to remove the old slip. The now redundant carriageway has been removed and a new kerb line installed along the edge of the A9.

Works are continuing on forming SUDS pond 1 by the Crematorium. Works to soil and dress the side slopes have been ongoing here this week.

On the West Connector road, work has continued forming the combined footway/cycleway as well as installing public utility ducts and lighting columns.

Concrete pours for the west foundations of the new footbridge over the A9 have taken place this week.

Drainage works and road formation works have been ongoing on the Ruthvenfield link section between the A9 and Inveralmond.

Road sufacing works have been taking place either side of the new road bridge over the A9.

Soiling and landscaping works have been ongoing throughout the site.