What’s happening on site 05-05-2017

The final concrete pour for S04 culvert walls took place this week, with work now focusing on constructing the culvert roof. Steel reinforcement and shuttering is currently being installed in preparation for the first roof pour next week.

Culvert S05 steel work and reinforcement is also processing, with the west side walls due to be poured next week.

Pilling has commenced on the east side of structure S01 bridge over the A9 as well as the central pier for structure S02 bridge of the River Almond.

Earthworks fill is continuing, forming the new northbound merge slip road with the A9, the Ruthvenfield Link section of the new road as well as the southbound diverge slip road from the A9.